The first step in this project was to remove roughly 300+ lbs of English Ivy. Subsequently, we had to remove a large amount of weeds, grasses and old plants. Then we regraded the entire berm and laid down geo-fabric. We also changed the border from a plastic paver to a beautiful 8-inch contoured paver block. Lastly, we planted new trees, shrubs and perennials. The cherry on top was a premium triple shredded hardwood mulch.